Skip to content

GUI Config

Configure how WSi displays costs and counts in the Graph View and Details panel.

Open via Settings → Client → Edit GUI config.

Display manufacturing costs

Choose whether the cost shown for each node includes or excludes surcharges:

SettingWhat it shows
Incl. surchargesTotal cost including project surcharges
Excl. surchargesBase manufacturing cost without surcharges

Both options can be enabled at the same time — this shows two cost values side by side.

Duration Format

Choose how time durations are formatted in the interface:

FormatExample
Decimal1.5 h
Hours and minutes1 h 30 min

Count Visibility

Choose which counts appear in the Status Bar and elsewhere in the interface:

SettingWhat it shows
ArticlesTotal number of articles in the project
WorkstepsTotal number of work step nodes
Stock materialNumber of different stock materials used

See Also